 | Helium blowoff during a fill. |
 | Helium blowoff during a fill. |
 | Helium blowoff during a fill. |
 | Helium blowoff during a fill. |
 | Barth tries to resuscitate a dead hard drive. |
 | Matt warms up the helium tank flange after a transfer. |
 | Our six hundred dollar ruler arrives taped to a piece of wood. |
 | One bolometer believes in doing its own thing (ie. going down while all the others are going up). It appears to be wired backwards on the array. A few other traces in this picture show nothing but noise, because they are broken or not connected. |
 | Tug-o'-war. |
 | Gaelen up on the forklift. |
 | Gaelen drills some new holes for the sun shields. |
 | Lazy Susan Positions? (From ARCADE). |
 | Cryo Colo(u)rs. |
 | The ARCADE highbay, all packed up. |
 | A slight change in wording can make all the difference. |
 | Mounting the chin. |
 | Nitrogen boiling in the dewar for the beam map cold source. |
 | Dr. Pepper. |
 | The X-Y Stage performing a beam map. |
 | Chris's soldering iron set to the Temperature of the Beast. Presumably measuring temperature in Fahrenheit rather than Celsius is more evil. |
 | The inside of the Watchdog Override Box. |
 | The outside of the Watchdog Override Box. |
 | The sun sensor mounted, with inch rule for scale. |
 | The sun sensor mounted, with inch rule for scale. Note also the Watchdog Override box, installed but not yet labelled. |
 | The watchdog override box, finally labelled. |