Tiny Tim getting ready to pick up ARCADE for a hang test. | |
The ARCADE highbay. | |
ARCADE hang test. | |
ARCADE hang test. | |
ARCADE hang test. | |
ARCADE hang test. | |
Chris plays Doom on Marie's iPod. | |
Barth goes out to Bemco the DAS again. | |
Gaelen and Marco prepare for another round of solar array testing. | |
Chris and Steve watch the solar array testing. | |
SBI being integrated in the LDB highbay. We were in Fort Sumner when SBI was launched in 2003 there. SBI is one of two other experiments accompanying us to the ice. | |
SBI's "inner frame". | |
The SBI instrument on an alignment jig. | |
ARCADE with the top open. | |
Some of the signs at the entrance to the balloon base. | |
Building 26. | |
Lots of controls on the conference room podium. | |
Marie, Gaelen and Ed waiting for the telecon to start. | |
The size of a 40 million cubic foot balloon, the size BLAST flies on. | |
Transferring the operating system to a new flight computer hard drive. | |
Joel takes a look through the microscope. | |
French themed safety glasses. | |
Chris and I play some Doom deathmatch. | |
Me deathmatching with Chris. | |
Me deathmatching with Chris. | |
Provolone Cheese Without Added Smoke Flavoring. | |
Gaelen takes the cart out for a joyride. | |
Another sunset. |