 | Jeff checks the alignment of the cryostat with a scope attached to the back of the secondary mirror. |
 | Enzo and Barth attempt to debug a problem with the watchdog circuit of the ADC cards. |
 | Enzo and Barth attempt to debug a problem with the watchdog circuit of the ADC cards. |
 | Plane crash. |
 | A view of the highbay from above the second-floor offices. |
 | The GPS repeater. It lets us receive GPS data in the highbay, which is great for debugging our GPS array. |
 | Matt overlooks the project. |
 | 180 seconds of highbay life. |
 | Matt and Jeff discuss removing the ladder to the third floor. |
 | Marco rotates his tyres. |
 | A view of the three balloon integration buildings: Chapel, Cathedral and Basilica. |
 | I tried to take some pictures of the moon emerging from behind the clouds. They turned out too dark. |
 | The second attempt. |
 | Removing the cryostat. |
 | Matt inverts the cryostat to get rid of the cryogens inside. |
 | Emptying the cryostat of nitrogen. |
 | Emptying the cryostat of nitrogen. |
 | Marie and Matt. |
 | Marie and Matt. |
 | Gaelen and Marco playing table tennis. |
 | The unused flag cabinet. Flags of nations currently represented at the base are flying. This is where they put the ones they don't need. |
 | Gaelen takes on Jaspaul. |