![Click to enlarge](img/th_0221.jpg) | Barth and Jeff inspect Jaspaul's thermal modelling of the gondola. |
![Click to enlarge](img/th_0222.jpg) | The Integrating Star Camera with its oversized baffle. |
![Click to enlarge](img/th_0223.jpg) | Mark checks the alignment of the optics box. |
![Click to enlarge](img/th_0224.jpg) | Another exterior shot of the high-bay. Photo taken by Matt. |
![Click to enlarge](img/th_0225.jpg) | Another exterior shot of the high-bay. Photo taken by Matt. |
![Click to enlarge](img/th_0226.jpg) | The high-bay and the hangar. |
![Click to enlarge](img/th_0227.jpg) | A picture of the high bay taken from the runway. Note the Piper. |
![Click to enlarge](img/th_0228.jpg) | A close up of the Piper Super Cub. |
![Click to enlarge](img/th_0229.jpg) | A close up of the Piper Super Cub. |
![Click to enlarge](img/th_0231.jpg) | The Piper's interior. |
![Click to enlarge](img/th_0232.jpg) | A close up of the Piper Super Cub. |
![Click to enlarge](img/th_0233.jpg) | The receiver team installs the cryostat. |
![Click to enlarge](img/th_0234.jpg) | Half way there. |
![Click to enlarge](img/th_0235.jpg) | Almost... |
![Click to enlarge](img/th_0236.jpg) | Jeff adjusts the leveling screws. |
![Click to enlarge](img/th_0237.jpg) | The pressure vessel open, showing several versions of Sam in various states of operation. |
![Click to enlarge](img/th_0238.jpg) | Finally a new Sam boots. |
![Click to enlarge](img/th_0239.jpg) | Unpackaging the Mirror in preparation of installation. |
![Click to enlarge](img/th_0240.jpg) | The cryostat in "torpedo mode" getting ready to lift the Primary Mirror onto the inner frame. |