Picture Gallery for Sun 2003-08-24 17:25:47 UTC


Matt testing the motorised valves.Matt testing the motorised valves.
Setting up the crane target for beam mapping.Setting up the crane target for beam mapping.
Setting up the crane target for beam mapping.Setting up the crane target for beam mapping.
The telescope looking out the door at the crane.The telescope looking out the door at the crane.
Adjusting the crane.Adjusting the crane.
The dewar of nitrogen.The dewar of nitrogen.
Trying to find the target.Trying to find the target.
The target detected in the star camera.The target detected in the star camera.
The receiver team looking for a signal.The receiver team looking for a signal.
The receiver team looking for a signal.The receiver team looking for a signal.
Pointing tests.Pointing tests.
Looking out from the doors of the hangar at the target.Looking out from the doors of the hangar at the target.
Looking through the gondola.Looking through the gondola.
Battery connection terminals.Battery connection terminals.
Phil talks with Jaspaul.Phil talks with Jaspaul.
Me as helmsman trying to scan the gondola over the source.Me as helmsman trying to scan the gondola over the source.
The source is detected.The source is detected.
The receiver team.The receiver team.
Pointing out of the high bay.Pointing out of the high bay.
Getting dark, still pointing.Getting dark, still pointing.
Getting dark, still pointing.Getting dark, still pointing.
Getting dark, still pointing.Getting dark, still pointing.
The dryer tube connecting the cryostat to the receiver covered now in aluminum tape.The dryer tube connecting the cryostat to the receiver covered now in aluminum tape.
Jeff prepares to install a laser on the secondary so we can point it at the source.Jeff prepares to install a laser on the secondary so we can point it at the source.

back