 | Solar arrays attached to the gondola. |
 | Matt affixes the magnetometer. |
 | Enzo and Mark put the DAS and Receiver back together. |
 | Mark tapes the baffle. |
 | Nick looks at noise. |
 | Heading outside. |
 | Heading outside. |
 | Rotating to point the solar arrays towards the sun. |
 | SBI being taken out. |
 | Grooming the snow. |
 | Chris sorts trash. |
 | BLAST outside charging the batteries with the solar arrays. |
 | Gaelen hides behind the rolling cart. |
 | Extreme close-up of the back of the bit sync. |
 | Part of the crown undergoing mylarisation. |
 | The primary. |
 | SBI doing pointing tests. |
 | ANITA out on their pad, doing tests. |
 | Chris tapes up the crown. |
 | Self portrait. |
 | Rotating the gondola. |
 | Rotating the gondola. |
 | Rotating the gondola. |
 | SBI again. |
 | Chris moves the pump cart while others rotate the gondola. |
 | Rotating the gondola. |
 | LDB antennas on the crown. |
 | BLAST and SBI outside. BLAST is designed to look away from the sun. SBI is designed to look directly at the sun, so they're facing opposite directions. |
 | Erebus. |
 | Sun on the solar arrays. |
 | Coming back inside. |
 | Coming back inside. |
 | Looking up at the hoist. |
 | Moving the lift into place. |
 | Enzo pulls out his big red parka. |
 | Attaching the crown. |
 | Attaching the crown. |
 | Ed schedules observations in the cold highbay. |
 | Mark at the top of the lift. |
 | Lorem ipsum strikes again in the New York Times' Digest. |
 | Breaducopia. |
 | Barth works on KST on the ride in this morning. |
 | Getting ready to put up the other side of the crown. |
 | Attaching the other side of the crown. |
 | Barth reassembles the ACS after making a minor modification. |